The Schoharie Reservoir

Intake House

Project Planning

  • Location of the project
  • Infrastructure for public use and construction support
  • Supplying construction materials
  • Stream control during construction
  • Intake House
  • Shandaken Tunnel
  • Preparation of the reservoir basin
  • Construction of the dam

Intake House, aka Shandaken Tunnel gatehouse

  • located on west side of reservoir
  • center of water operations since 1924
  • sluice-gates screen the water keeping flotsam out of the gatehouse
  • electric derrick and grapple remove debris from channel
  • plumbing fixtures ordered in 1922
  • 4 massive castings that act as splitters
  • on the right is assembled hydraulic cylinders and valves to open and close flow hydraulically
  • assembled pipes with hydraulic shut-off valves were laid in a sub-basement